Bilkent Entegre Healthcare Campus is the largest healthcare campus in Europe at present with a closed area of 1.2 million square meters. In this project, we are proud to be present with installation connection systems, modular profile systems, seismic restraint systems and ventilation connection systems.
In the project, pipe bundles with pipes of DN600 were transported by calculating the static + thermal + earthquake loads with LINK Modular Profile Systems with 4.7 meters of suspension distance without needing any welded fabrication.
In the project, LINK Engineering Team also supported the construction site in important topics such as fixed point design.